Client:
Refinery JCS Naftan - Novopolotsk, Republic of Belarus
Project for the following section of the Plant:
- Diesel HDT LCH-24/7 Unit - Revamp
- Kerosine MEROX Unit - Revamp
- NAPHTHA HDT Unit - New section
Total capacity of plants 160 T/h.
Revamp with aim of produce Ultra Low Sulfur Diesel with max 10 ppm sulfur in accordance with EN 590 specification.
Project activities:
- Detailed I&C design project, specifications of instrumentation equipment and control systems
- P&I diagrams design
- Equipment and cable tray layout, loop diagrams (ESD, DCS)
- On site supervision for I&C installation and stratup
Control systems:
- Distributed Control System (DCS) Yokogawa Centum
- Emergency Shutdown system (ESD) Yokogawa ProSafe RS
Number of signals:
- 3800 input/output signals